Tunnel boring machine carried by SPMT(self propelled modular trailer)


Tunnel boring machine carried by SPMT(self propelled modular trailer)




Ruiqianhe SPMT in China took care of the special inland transport of a tunnel boring machine from Yangzhou to Shanghai.

The components of this dimensions is
TBM shield 10.55 m diam.
Max. unit weight of 190 tons of single lift (Cutter head drive)
http://www.heavyhaulagetrailer.com/self-propelled-modular-transporter-spmt-spt-p126.html

www.heavyhaulagetrailer.com

www.ruiqianhe.com


Four Axle front loading low bedsemi-trailer(detachable gooseneck low bed semi-trailer)












Product Description


 Dimensions
 Overall length 19255mm
 Overall width 3300mm
 Overall height: 2000mm
 (The above dimension will be adjusted according to the tractor specification )
 Capacity
 Loading capacity: 100Ton

 Running gear
 FUWA or BPW or L1 high quality Trailer Axle 20Ton, Four Units;
 Tires: 315/80R22.5 16 PCS,
 Wheel Rim: 9.0-22.5 16PCS;
 Kingpin 3.5" bolted type.
 Longitudinal beams: Top flange 25mm, bottom: 30mm, middle thickness: 12mm. Height: 500mm, width: 220
 Platform: 5mm thickness checked steel floor
 Ramp: 2 units 600mm width spring ramps in front.
 Suspension: Spring suspension
 Brake system: Dual air brake system, relay valve made in China, no ABS brake system
 Rotary support: About 24 unit in two side of the trailer
 Small hydraulic pump station: Diesel, gear pump, starter, hydraulic cyclinder

 Accessories
 Tool box: 1 PCS.

 Painting
 Before the painting, surfaces and accessories are made smooth and then cleaned with a mixture of chemicals;
 Steel blasting completely;
 Painting color is according to customer's wish.

 Package
 Shipped by bulk vessel with whole unit. Package three unit together


Contact to get the detail and



E-mail: heavytransportequipment@yahoo.com
E-mail: info@ruiqianhe.com


2017年6月15日星期四

Heavy wind turbine and Windmill Blades for transport


Heavy wind turbine and Windmill Blades for transport




RQH extendable trailer and modular trailer recently handled a heavylift cargo of wind turbine and Windmill Blades.

with the gooseneck and 6 line module which carry of 90 ton wind turbine of Vestas 1.5 MW turbine.

with 3 axle extendable trailer which with 3 section telescopic boom,which can extend up to 50 m,carry of the wind blade of 56 m in total length.






along with the 4 axle extendable trailer which with 2 section telescopic boom,which can extend up to 45 m,carry of the tower section of 70 ton and 35 m in total length.

www.heavyhaulagetrailer.com
http://www.heavyhaulagetrailer.com/wind-blade-trailer-p129.html


In a separate operation the wind blade trailer also handled the discharge and inland transport of 90 pcs pipes with measurement 40 m x 2.94m x 3m weight 13 mt each and a cargo of reactor , heat exhangers and storage tanks of such trailers.

2017年6月14日星期三

concrete beam transport in bolivia by RQH modular trailer



concrete beam transport in bolivia by RQH modular trailer

Bolivia client extremely busy in recent weeks to move several heavy and oversized concrete girder under narrow road and over by pass including some special precautions like moving overhead wires.

The scope of the first featured transport project included the movement of 60 oversized pieces bridge beams, the larges one with dimensions of 35,000 x 3,80 x 3,30 m and weight of 70 tons.
Their second project was about the movement of a series of heavy transformers with the heaviest unit weighting 156 tons and dimensions of 8,50x 3,00x 4,00 meters. The performance of these transportations was done by bolivia client with their own special RQH modular trailers.

http://www.heavyhaulagetrailer.com/nicolas-model-modular-trailer-multi-axle-p124.html

Ruiqianhe Goldhofer thp/sl was commissioned to carry a 32-meter-long rotary cooler in Malaysia.

Ruiqianhe Goldhofer thp/sl was commissioned to carry a 32-meter-long rotary cooler in Malaysia.

The cooler has a weight of 190 tons and 4.50 m in diameter. Due to the size and weight, it was not possible to bring this cargo directly by road to factory and it was necessary to find a suitable area where the transhipment from truck to barge had to be performed by using roll on and roll off.

After a successful examination of the track, the vehicle was then defined, a 22-axle trailer type Goldhofer thp/sl with turn table, and transport permits including requested approval of required structural analyzes were organized.

Due to the extreme hot weather in May, when the transport would have to take place, the river was flood, and the transport had to be postponed for 3 weeks until the river come to normal.

The transport with the total dimension of 52 x 4.50 x 5.50 m and 320 tons started in the end of May. A Mercedes 8 x 6 was used as pull truck and another supported the transport as a push truck. Due to the size of this cargo and the route course the transport was also accompanied with two supporting escort cars for a smooth transport.

Next morning the cooler was moved from truck into the barge by roll on and roll off

In Malaysia, the barge arrived side by side the waiting ocean vessel for the oncarriage to factory being its final destination.

http://www.heavyhaulagetrailer.com/goldhofer-modular-trailer-multi-axle-p125.html

2017年6月12日星期一

Transformer transport with the Ruiqianhe modular trailer


Transformer transport with the Ruiqianhe modular trailer




250t transformer on Ruiqianhe modular trailer units transported in Argentina

250 ton transformer was loaded onto a hydraulic platform trailer combination with 2 vessel cranes. This involved a Ruiqianhe vehicle combination consisting of a 18 axle line modular trailer.
The transport was carefully manoeuvered by remote control between parked cars on both sides of the street up to the entrance of the substation. This particularly narrow entrance to the facility could easily be negotiated due to the excellent manoeuverability of the Ruiqianhe and the 55°steering angle. Once at the transformer box, the load was pulled into its final position with the help of rope winches using rails which were mounted under the transformer wheels.


For the delivery of the Ruiqianhe modular trailer, no additional transportation costs are incurred. The modular traileris simply coupled to each module axles and can be both on rough terrain as well as on public roads and motorways with speeds here reaching up to 80km/h at max.

http://www.heavyhaulagetrailer.com/nicolas-model-modular-trailer-multi-axle-p124.html

2017年6月11日星期日

SPMT(self propelled modular transporter) hauls ship block


key words:self-propelled modulartransporter(SPMT);spmt;heavy transporter;heavy lift;self propelled trailers(SPT)
Ruiqianhe SPMT (self propelled modular transporter) safely executed a challenging job of shifting four huge ship block in Keppel, in the china.
Keppel Heavy Industries, a singapore based company specializing in ship building,



expecial on off shore engineer, had tied-up with Ruqianhe SPMT for all land transportation job in their china manufacture base. The scope involves haulage and positioning of three evaporators in nantong base, in the east coast of china.
The ship block started from the facility to jetty 5 Kilometers. The size of each ship block was 38 meter in Length, 15 meter in Width and 9 meter in height and its total weight is 860 tons including all steel beams.
SPMT (Self-Propelled Modular Transporter) had to move-in slowly at turtle speed to carefully maintain the of the cargo.
Another task came unexpectedly in the form of on-going road construction work on the stipulated route; due to which a new road had to be laid down, all the way upto the main entrance of the site. Heavy equipment were pressed into service to develop access path for SPMT. Despite initial hiccups, the first ship block reached its destination within 24 hours.